Side Walk And Drainage Being Constructed

Mechanical Seals Replaced On Loading Arm, Sand Down Prime And Paint Structure, Drain And Replace Oil In Pump House, Fabrication Of Doors And Changing Of Hinge

Completed Foundation and Safety Rails Installed Around CNG Compressor

Civil Works In Progress
Strengthening Integrity On Property
Changing out Railings

PESL Personnel In Full PPE Repairing A Isolation Valve On Ammonia Plant (AUM)

Infrastructure Being Prepared For Laying Of Cement

Open Trench

Foundation And Safety Rails Installed For CNG Lines

Foundation Being Done

Removal Of Rubble According To HSE Standards

Installation Of Hand Rails Prime And Paint

Men At Work Clearing The Rubble And Preparing The infrastructure